How we work
Most hardware projects with us start small: a call, a feasibility check or a day at a factory. These first steps have fixed prices, so you know the cost before we start. Development, tooling and production are then quoted per project, once the scope is clear.

All prices in USD. Travel within Shenzhen and Dongguan is included in the factory day. Travel further away is charged at cost, agreed before the trip.
| Engagement | What you get | Price | Best for |
|---|---|---|---|
| Fit call 20 minutes, video | We look at your scope, stage and timeline, tell you whether we are the right partner, and name the next step. | Free | Companies with a written specification, a prototype or a budget |
| Expert call 60 minutes, video | Answers to one specific question: architecture, a supplier, a component, a certification path. Written notes afterwards. | USD 150 credited if you go ahead | Early-stage products and one-off questions |
| Engineer day at the factory | An engineer on site: supplier visits, negotiation in Chinese, problem solving on the line, sample and first-article reviews. Written report with photos. | USD 650 per day | Choosing a supplier, problems in production, sample approval |
| Feasibility check | A written go/no-go: main technical risks, key components, certification path, rough cost and timeline, recommended next steps. | USD 900 fixed | Products at idea or concept stage |
| Feasibility and architecture study | Architecture options with their trade-offs, component and supplier options, BOM direction, certification plan, cost and timeline estimate for development, tooling and production, and a prototype plan. | From USD 3,500 fixed price agreed after the fit call | Products moving towards a first engineering prototype |
| Development, tooling and production | Engineering, prototypes, design for manufacturing, tooling, supplier management and production oversight. | Quoted per phase | After feasibility |
The cost of developing a product depends on a few drivers more than on anything else: how much new electronics it needs, whether it has a radio and a battery, which enclosure process the volume justifies, which markets it must be certified for, and how many prototype rounds the requirements force. A published range for "a hardware product" would span two orders of magnitude and help no one. The feasibility check and the architecture study exist to turn those drivers into a number you can plan with.
Projects are led by Kai Färber, the founder of China Worx: a German engineer based in Shenzhen, working in German, English and Chinese. Engineers and specialists are added as the project needs them, and the person you speak to in the fit call stays with your product.
The steps from concept to delivery are described under Approach, and the engineering side in detail on Hardware Development.